Manus Roadworks Project
In June 2018 Hornibrook NGI LTD (HNGI) were engaged by Jacobs on behalf of the Australian Department of Home Affairs to submit a tender for the remediation of 4.4 kilometers of unsealed roads within Lombrum Base and for the sealing of a further 5.65 kilometers of road between Lombrum and Lolak Junction.
The road sealing option of an asphalt surface was accepted by the client.
The works also included the Fabrication, Supply and Installation of a 12metre bridge over
a section where a tidal creek dissected the road. The bridge was fabricated by HNGI’s
Steel Fabrication Division and transported to Manus and installed by the HNGI Bridge
team.
HNGI provided a full engineered design for the works that encompassed geo technical
investigations and reports, full survey and as constructed details, and the base course
preparation and road building specifications, which were all aligned with the PNG
Department of Works and Aust.Roads standards.
Extensive drainage works and remediation of existing table drains and culverts were
carried out prior to commencement of the road building activities, along with clearing and
grubbing of the verges.
The road base materials were sourced locally on Manus and crushed and screened by a local Manus business, also employing local personnel to carry out the works. Prior to using the crushed road base material, samples were sent to a laboratory in Lae for testing, and the results passed all criteria for suitability, which reduced HNGI’s need to import materials from elsewhere.
The aggregates for the asphalt sealing works were also sourced locally on Manus, and also passed the test criteria for suitability.
the works included the use of a Wirtgen road recycling machine, which was the first time such methodology had been used on Manus, to prepare and cement stabilize the basecourse prior to the sealing works. The cement stabilization methodology provides a vastly increased quality of substrate for the road, and increases the lifespan of the sealing.
A high level of quality documentation was developed by HNGI’s Project Engineer for the works, which ensured that all works achieved the relevant standards and specifications. This resulted in an outstanding road surface which has been recognized by the client and also the Manus Regional Department of Works management team.
The Base Commander at Lombrum, where a large contingent of personnel reside, has praised the HNGI team for their support and cooperation during the project and has mentioned that the new road provides everyone living in that area of Manus with a greatly enhanced means of transport into the island center of Lorengau for shopping, hospital and other activities.
The road works were successfully completed in January 2019 on schedule, without any safety incidents for the duration of the project.
Contract Period: 2018
Client: Jacobs on behalf of the Australian Department of Home Affairs
Services: Civil works Roads Fabrication Bridging
Value: Approx. PGK 22,481,000